Nuestros comunicadosVer filtrosElegir filtrosAplicar filtrosDateCualquieraTitleThis field is required. Please enter a value.Date (field_date_only)This field is required. Please enter a value.Date (field_date)MinThis field is required. Please enter a value.MaxThis field is required. Please enter a value.Aplicar filtrosClear All08 Agosto 2008ANEEL approves a 12.17% tariff increase at Escelsa's annual tariff readjustment processDownloadConsult01 Agosto 2008EDP awards construction of Soto 5 CCGTDownloadConsult23 Julio 2008EDP: Provisional volumes statement 1H08DownloadConsult21 Julio 2008Modification to the chain of entities controlling the qualified holding of IPICDownloadConsult17 Julio 2008Construction of Fridão and Alvito hydro plants in Portugal awarded to EDPDownloadConsult03 Julio 2008Standard & Poor revised outlook on EDP from negative to stableDownloadConsult19 Junio 2008Competition Authority authorises operation of Alqueva and acquisition of mini-hydros by EDPDownloadConsult18 Junio 2008Energias do Brasil and Grupo Rede agree to an asset exchange which reinforces EDP Group's position in power generation in BrazilDownloadConsultLoad MoreCommunication axisInternal Operations
08 Agosto 2008ANEEL approves a 12.17% tariff increase at Escelsa's annual tariff readjustment processDownloadConsult
21 Julio 2008Modification to the chain of entities controlling the qualified holding of IPICDownloadConsult
17 Julio 2008Construction of Fridão and Alvito hydro plants in Portugal awarded to EDPDownloadConsult
19 Junio 2008Competition Authority authorises operation of Alqueva and acquisition of mini-hydros by EDPDownloadConsult
18 Junio 2008Energias do Brasil and Grupo Rede agree to an asset exchange which reinforces EDP Group's position in power generation in BrazilDownloadConsult