Skip to main content

IBO Foundation - A2E Fund

Access to energy

Access to energy

 
In Mozambique, solar energy will strengthen the continuity of healthcare at Ibo District Hospital.

Ibo District Hospital is the only public healthcare facility serving around 41,000 people on the island and in nearby coastal communities. It provides essential services such as maternal care, emergency care, minor surgery, laboratory diagnostics, and outpatient services. 

However, frequent and prolonged power cuts compromise hospital operations and the quality of care. The existing diesel generator provides a limited response because of fuel costs, shortages, and maintenance difficulties in a remote region dependent on maritime transport. 

Country: Mozambique 
Region: Ibo Island, Cabo Delgado

The project will install a solar photovoltaic system with batteries to strengthen the stability of the electricity supply at Ibo District Hospital. The grid and the existing generator will serve as backup sources, reducing disruptions to maternity, emergency, surgical and diagnostic services, as well as the storage of vaccines and medicines.

The solution responds to the specific conditions of Ibo Island, where access to fuel, spare parts and technical assistance is limited. Ten years of remote monitoring will make it possible to track the installation’s performance, identify potential faults and support maintenance.

The project also includes practical training for electrical students, hospital staff and representatives of local organisations. Participation in the installation and post-commissioning sessions will develop skills in operation, basic maintenance and safety, strengthening local capacity to manage the infrastructure over the long term.

Results expected
  • A solar system with storage, integrated with the grid and generator, will ensure greater continuity of essential healthcare, including maternity, surgery, emergency care, diagnostics and inpatient services.
  • Improved quality and resilience of healthcare services for a remote population of approximately 41,000 people.
  • Student and technician participation in the installation will provide practical experience in the operation and maintenance of solar systems.
  • Training for hospital staff and local organisations will strengthen autonomy and safety in infrastructure management.
  • Reduced dependence on the grid and diesel will lower energy costs and disruptions to healthcare services. 
Main Classifications
PT-ODS7.png
PT-B4SI-DesEconomico.png
27.6 kWp

Power Installed

1,200

Direct Beneficiaries

41,000

Indirect Beneficiaries

A2E Fund - Program

This is one of the projects supported by EDP's A2E Fund. Learn more about this program. 

Want to know more about EDP Y.E.S.?
Let's build a lasting relationship. Contact us to request more information about our programs and projects, or apply for support by filling out our form, and we'll get back to you shortly.
Categories
1794251661
Carbon impact evaluator
This web page produces:
per Byte
0.000
g CO2
▲
per Visit
0.000
g CO2
▲