Proaza Hydropower Plant

Power Plant Information
  • Name: Proaza
  • Company owner: EDP
  • Location: Trubia River, Proaza
  • Watershed: North - Nalón
  • Supplying Reservoir: Valdemurio
  • Began operations: 1968
  • Usable volume of reservoir (Hm³): 1.2
  • Type of dam: Gravity for both Valdemurio and Olid
  • Power plant type: Derivation and surface
  • Number of alternators: 2
  • Turbine Type: Vertical Francis
  • Net capacity (MW): 49,54
  • Energy produced in average year: 81,500 MWh
  • Number of sets: 2
  • Maximum flow of equipment: 40 m³/s

Would you like to visit the Proaza Hydropower Plant?

Check out our visit program and sign up using the form under "Other facilities"