Skip to main content

Rail Splitter Wind

railsplitterii_bg1_web.jpg
Wind

Rail Splitter Wind

Monday 12, October 2020
Installed capacity of 100 megawatts (MW)

Project overview

Rail Splitter Wind is located in Tazewell and Logan Counties, north of the town of Lincoln. The wind site is near the towns of Delavan, Hopedale, and Emden on a glacial moraine known as Union Ridge.

Economic benefits

Rail Splitter Wind yields significantly in the form of payments to landowners, local spending, and annual community investment. Rail Splitter Wind is also compatible with other land uses and provides a stable form of income to local landowners.
$58.7 million
Total project impact
$11.8 million

Revenue for public services

$14 million

Revenue for landowners

$32.8 million

Local spending

Job creation

73 construction jobs and 8 permanent jobs created

Renewable energy technology

wind_turbine_tractor.jpg

Energy security

Rail Splitter helps strengthen energy security for the state of Illinois and the U.S., helping diversify domestic supply.
wind_turbine_sun.jpg

Wind energy and land use

Wind turbines have a limited footprint, leaving 98% of the project’s leased land available for farming, or wildlife habitat.
quiltblock_edpr_chelseaparrett_41-133.jpg

Wind energy and American manufacturing

450+ American factories produce parts and materials for the U.S. wind industry, which employs 130,000+ Americans.
Nature_Stream_decarbonization.jpg

177.8 million gallons of water saved each year

Rail Splitter saves more than 177.8 million gallons of water each year and prevents the air pollution that causes smog and acid rain.

Download

Rail Splitter Fact Sheet
Document
PDF . 1.07 MB
Illinois State Fact Sheet
Document
PDF . 1.35 MB
Illinois Landowner and Farmer Wind Farm Testimonial
Document
PDF . 965.07 KB
About EDPR NA
Document
PDF . 2.39 MB
If you’re a landowner with questions about payments or records, please visit our Landowner Portal. This portal is designed to streamline the management of your land inquiries, making the process more efficient and easily accessible.

Contact us

Rail Splitter Wind
Operations & Maintenance Office


201 NW Main Street
Hopedale, IL 61747


309.808.7918
RailSplitterWind@edpr.com

Categories
1787792367
Carbon impact evaluator
This web page produces:
per Byte
0.000
g CO2
per Visit
0.000
g CO2