EDP Portugal
Baixo Sabor Hydroelectric Plant - Recape - Deforestation Plan
September 2009
In the Environmental Impact Study developed for the Baixo Sabor Hydroelectric Plant, the Deforestation and Prior Cleaning of the Flooded Area was recommended as a Minimization Measure. As such, this plan presents the different activities considered, the periods needed to carry them out and the main constraints to be taken into account.
Document Author
Edp - Gestão da Produção de Energia, S.a.
Institution
Edp - Gestão da Produção de Energia, S.a.
Year
2006
Geographic Location
Portugal
Companies
Portugal
Technical-Scientific Characterization
Recape
Technical-scientific subarea