Access to energy
Project
aQysta BV - A2E Fund

In Malawi, installing innovative irrigation technology.

Farming in Malawi is challenging. Over 80% of the population has its own farm and depends on it for its food and income. The rainy season is most important as farmers grow their staple food: maize. Farming during the dry season is only a possibility for those whose land is situated along a river, lake or irrigation canal. Most farmers, however, do not practice dry season irrigation due to the high financial risks involved in pumping when using diesel or solar pumps (risk of losing pre-investment in case of harvest failure).

water carousel

EASI-WATER, EASI-PAY: Enabling Malawian smallholder farmers to approach farming commercially

aQysta BV

Malawi, Blantyre, Zombas, Thyolo districts

The proposed project will enable 250 smallholder farmers to practice irrigated agriculture during the dry season (cash crop cultivation) and rainy season (supplemental irrigation of staple crops) by means of this innovative irrigation technology. The Barsha Pump is a hydro-powered water pump (generating a pressure equal to 100 W or 72kWh per month) that lifts water from rivers or canals by only using the energy present in the water flow. The Barsha Pump has the capacity to pump water up to 40 meters high, or up to 2 km inland, and distributes the water over farmers' land through drip irrigation.

The Barsha Pump addresses the financial constraints of farmers as the equipment is leased through Pay-As-You-Harvest or Pay-As-You-Use while the pump does not incur any operational and maintenance costs. In addition, farmers that make use of the Pay-As-You-Go schemes are provided a guaranteed off-take of their produce and receive free advice about optimal pump use and crop management.

Expected outputs:

  • 50 Barsha pumps and 50 irrigation kits installed
  • Installed renewable capacity of 3.600 kWh per month, based on an installed renewable energy capacity of 6 kW that can be used 24/7
  • Each Barsha pump prevents the emission of 0.8 t CO2/year
  • Up to 150% farmer income
  • Creation of 15 jobs

Status December 2021:

  • Site feasibility and promotional activities conducted
  • 50 pumps already installed and operational
  • 255 farmers trained on Barsha pump operation, entrepreneurship and market development
  • Development of the farmer incubator model with 46 farmers under training
  • Execution rate: 100%*

Disclaimer: The implementation rate is calculated based on the specific objectives activities for each project. Most of those objectives are set from the acquisition and implementation phase of the energy systems.

 

Main Classifications
SDG7
Economic Dev
Impact (results)
250
Direct beneficiaries
2000
Indirect beneficiaries
A2E Fund - Program
Lazy image
A2E Fund
This is one of the projects supported by the A2E Fund. Learn more about this program here.
Other projects
Subscribe to our newsletter

Our program brings together over 500 social responsibility projects, investing more than 30M€ each year to create positive change on a global scale.
We are thrilled to invite you to subscribe to our newsletter and join the movement!

terms of the GDPR privacy policy
EN
 
Information about the processing of your personal data:

EDP ​​- Energias de Portugal S.A. (“EDP”) is the entity responsible for processing your personal data submitted in this form for the purpose of sending newsletters related to the social responsibility projects developed by the EDP Group, which are processed based on your consent.We inform you that EDP may resort to subcontractors who will process the data in the name and on behalf of EDP under the terms of the contracts established with these entities and following instructions from EDP. EDP ​​will keep your personal data as long as you are interested in receiving our newsletter, or for a longer period if legally obliged to do so. In any case, EDP always implements the appropriate technical and organizational measures.
You may exercise your rights of access, rectification, deletion, portability, limitation or opposition by sending an email to SICO@edp.com. You may also, through this email address, withdraw your consent to the processing of data for the indicated purpose, which does not, however, invalidate the processing carried out up to that date based on the consent previously given.You can also submit a complaint to the National Data Protection Commission, if you consider that your rights in this matter have not been respected. For any question related to this information, you may also contact EDP's data protection officer (DPO), via email dpo.pt@edp.com.

---------------------------------------------------------------------------------------------------

PT

 
Informação sobre o tratamento dos seus dados pessoais:

A EDP - Energias de Portugal S.A. (“EDP”) é a entidade responsável pelo tratamento dos seus dados pessoais submetidos no presente formulário para efeitos de envio de newsletters relacionadas com os projetos de responsabilidade social desenvolvidos pelo Grupo EDP, sendo os mesmos tratados com fundamento no seu consentimento. Informamos que a EDP poderá recorrer a subcontratantes que tratarão os dados em nome e por conta da EDP nos termos dos contratos estabelecidos com essas entidades e mediante instruções da EDP. A EDP conservará os seus dados pessoais enquanto mantiver o interesse em receber a nossa newsletter, ou por período superior se estiver legalmente obrigada a fazê-lo. Em qualquer caso, a EDP implementa sempre as medidas técnicas e organizativas adequadas.
Poderá exercer os seus direitos de acesso, retificação, apagamento, portabilidade, limitação ou oposição através do envio de e-mail dirigido a SICO@edp.com. Poderá igualmente, através do referido endereço de correio eletrónico, retirar o seu consentimento para o tratamento dos dados para a finalidade indicada, o que não invalida, no entanto, o tratamento efetuado até essa data com base no consentimento previamente dado. Poderá ainda submeter uma reclamação junto da Comissão Nacional de Proteção de Dados, se considerar que os seus direitos nesta matéria não foram respeitados. Para qualquer questão relacionada com a presente informação poderá ainda contactar o encarregado de proteção de dados (DPO) da EDP, através do e-mail dpo.pt@edp.com

---------------------------------------------------------------------------------------------------
ES

 
Información sobre el tratamiento de sus datos personales:

EDP ​​- Energias de Portugal S.A. (“EDP”) es la entidad responsable del procesamiento de sus datos personales enviados en este formulario con el fin de enviar boletines relacionados con los proyectos de responsabilidad social desarrollados por el Grupo EDP, que se procesan en base a su consentimiento. Le informamos que EDP podrá recurrir a subcontratistas que tratarán los datos en nombre y por cuenta de EDP en los términos de los contratos establecidos con estas entidades y siguiendo instrucciones de EDP. EDP ​​conservará sus datos personales mientras esté interesado en recibir nuestra newsletter, o durante un período superior en caso de obligación legal. En cualquier caso, EDP siempre implementa las medidas técnicas y organizativas adecuadas.
Puede ejercer sus derechos de acceso, rectificación, supresión, portabilidad, limitación u oposición enviando un correo electrónico a SICO@edp.com. También podrá, a través de esta dirección de correo electrónico, retirar su consentimiento para el tratamiento de datos con la finalidad indicada, lo que, sin embargo, no invalida el tratamiento realizado hasta esa fecha en base al consentimiento previamente prestado. También puede presentar una reclamación ante la Comisión Nacional de Protección de Datos, si considera que no se han respetado sus derechos en esta materia. Para cualquier cuestión relacionada con esta información, también puede ponerse en contacto con el delegado de protección de datos (RPD) de EDP, a través del correo electrónico dpo.pt@edp.com.

 
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.