url: 'https://edp.com/en/innovation/innovation-projects/fish-lift'
title: 'Fish Lift'
author:
  name: admin
  url: 'https://edp.com/en/user-account/1'
date: '2025-03-03T17:48:58+00:00'
updated: '2025-03-26T23:05:02+00:00'
type: project
tags:
  - 'Innovation Ecosystem'
  - 'Distributed energy systems'
  - 'Innovation Projects'
  - Global
image: 'https://edp.com/sites/default/files/styles/media_library/public/image/2025-03/139657_20130715173847773.jpg.webp?itok=xakDDiYS'
published: true
og:
  'image:url': 'https://edp.com/sites/default/files/styles/media_library/public/image/2025-03/139657_20130715173847773.jpg.webp?itok=xakDDiYS'
schema:
  '@context': 'https://schema.org'
  '@graph':
    -
      '@type': NewsArticle
      datePublished: 'Mon, 03/03/2025 - 17:48'
      dateModified: 'Wed, 03/26/2025 - 23:05'
    -
      '@type': Project
      url: 'https://edp.com/en/markdownify/node/141681'
      name: 'Fish Lift'
    -
      '@type': Service
      areaServed:
        '@type': Country
        name: Global
    -
      '@type': WebSite
      inLanguage: English
---
##  [Fish Lift](/en/innovation/innovation-projects/fish-lift)

 Date

2022-05-11T12:00:00Z

  Breadcrumb

- [ Home ](/en)

    - [ Node ](/en/markdownify/node)
- [ Node ](/en/markdownify/node)
- Fish Lift

Distributed energy systems

## Fish Lift

 Wednesday 11, May 2022

[Distributed energy systems](/en/taxonomy/term/3101)

Market

[Global](/en/global/global)

Core Topics

[Innovation Projects](/en/taxonomy/term/7446)

### The fish lift is a project developed at Touvedo Dam, located on the Lima River

The fish lift consists of a collecting channel located on the downstream side of the dam, which has three inlets fed by a flow of water that attracts the fish. The fish enter this channel and continue to a tank, a quadrangular container with approximate dimensions of 0.80 meters by 1.40 meters. This container holds water and a drawn grid that helps measure the size of incoming fish. Every 4 hours, the tank automatically rises to the upstream level, where it releases the fish into the Touvedo reservoir.

### Purpose

Evaluation of the performance of the fish passage device (fish lift), as well as the definition and implementation of measures to improve its operation.

### Benefits

Intangible environmental benefits, by mitigating the impact of the Touvedo dam on river connectivity, the lift enables several species to continue their usual route along the river, particularly for breeding migrations.

### Partnerships

EDP Production

EDP Labelec – Environment

Higher Institute of Agronomy ([ISA](https://www.isa.ulisboa.pt/)) of the University of Lisbon

### Description of Labelec's Participation

Planned and coordinated by Labelec, this project enables the transfer of results and technical-scientific knowledge to the systematic operation of the Touvedo Hydroelectric Power Station, particularly the following:

- Vídeo-monitoring of the fish lift;
- Monitoring of fish fauna downstream of the dam;
- Evaluation of the effectiveness of the fish lift;
- Integration of monitoring, project and operational information;
- Definition of measures to increase the efficiency of the lift.

## Related Content

 [

Project

 AmBIENCe: Extending energy performance contracting to active buildings

AmBIENCe is a project aiming at extending the concept of Energy Performance Contracts

 ](/en/projects/ambience-extending-energy-performance-contracting-active-buildings)

 [Project

 PRR ATE – Alliance for Energy Transition

PRR ATE – Alliance for Energy Transition

 ](/en/innovation/innovation-projects/prr-ate-alliance-energy-transition)

 [

Project

 New metering service

EDP Labelec launches a service to optimize time and resources in testing metering systems for medium voltage installations.

 ](/en/innovation/innovation-projects/new-metering-service)

1767691824